Microsoft Quietly Retreats from Claude Code After Token Cost Overruns
Microsoft is cancelling most direct Claude Code licenses after the tool spread beyond engineering to non-technical roles and burned through budgets faster than expected. The move signals broader industry repricing of usage-based AI tooling as token costs exceed predictions.
· Tom Warren
View the original source
Read this Signal briefing